1. Design artwork
Artwork designs are generally produced by CDR or AI software, such as customer can not provide, our company can be completed free of charge with customers to design and produce artwork.
2. Open mold.
A mold is divided into three steps, the first step is to design a good plan issued by the first open an offset, and then work through the offset carved out of copper, then bronze sculpture out of steel workers.
3. Practicing plastic
According to customer specified international standard Pantone color number for color training in plastic.
4. Materials nuclear sub
Materials required for each bracelet is 7g, finished weight of 6g. To ensure the quality of each bracelet, each bracelet before discharge must pass through the electronic scale accurate scale materials.
5. Die Technology
Mold on the machine is ready, a good production. After the mold is installed, you need to heat up the machine, the general warming of time determined by the size of the machine, used by our company are 200 tons machine, so heat up about two hours longer. Daily output of a machine in about 25 000, I take a total of 28 sets of molding machine, daily production exceeded 500 000.
6. QC (quality control)
Bracelet produced, the need to first pass the quality control department checks to see whether they are qualified products, such as the inspection pass rate of sub-requirements, the finished production on duty all scrapped.
7. Trimming
Each bracelet will be produced by waste left side, after passing the QC inspection, after the product sent to the Ministry of trimming process. (Average per person per day trimming the number of about 5 1000).
8: QC (quality control)
Repaired in the post-process side, then back to QC check to get an outlet pass, if the failure to scrap the product.
9: Packaging Division
The products will be inspected and the packaging, packing into 0PP individually wrapped, 100 a bag. A box of 20 packets (export standard box), and the second is bare, 100 a bag, a box of 20 packets.
10: QC (quality control)
Upon completion of inspections by the QC package number, if no problem then sent back to warehouse for packing and waiting for delivery.
11: Finished |